| Organisation | Data Management | Meetings and Workshops | Milestones | Reports |
Communication between participants will be mostly by electronic mail and telephone.
Through the partners' extensive connections, other scientists participating in relevant modelling activities (but not part of the Concerted Action) will be consulted and, when considered appropriate, may be invited to meetings, workshops or to review outputs of the project.
| (POL) | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Task | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| (IfM) | (RI) | (ULG) | (IMR) | (POL) | (DH) | (MUM) | (DHI) | (IFR) | |
| IfM | RI | ULG | IMR | POL | DH | MUM | DHI | IFR | |
| IMR | POL | POL | POL | IMR | POL | POL | POL | DHI | |
| RI | IfM | RI | DH | DH | RI | DH | DH | MUM | |
| POL | ULG | DHI | RI | RI | DHI | RI | RI | POL | |
| DH | IfM | MUM | IfM | IMR | DHI | IMR | RI | ||
| ULG | MUM | IfM | IMR | Ifm | ULG | ||||
| IFR | MUM | IfM | MUM | ||||||
| IMR | ULG | ULG | ULG | ||||||
| IFR | IFR | IFR | |||||||
(MUM=MUMM, IFR=IFREMER above)
No observational data will be collected during the project. All observational data to be used has been quality controlled and is stored in national data centres. Much of the data has been collected within Mast-2 and Mast-3 projects and has therefore been subject to EC code on data management. Data management in this project will refer solely to model-generated data.
Quality control of model results will come from the sensitivity studies, the comparison of model
results from a specific year to a climate field, and from the real 1:1 validation of the models. The development of a unified methodology for the assessment of model results should be considered as an important step towards quality control of model results.
A CD-ROM will be produced containing:
A workshop involving all partners will be held at critical points in the project. Four workshops are planned:
Additional smaller meetings will be held between the coordinator and partners involved in specific tasks to ensure that milestones will be completed.
|
|
|